Difference between revisions of "Main Page"

From DestinationSSM
Jump to: navigation, search
m (Short Term Checklist)
m (Short Term Checklist)
 
(3 intermediate revisions by the same user not shown)
Line 18: Line 18:
  
 
* Make thicker brackets for headlights
 
* Make thicker brackets for headlights
* Get ballast to put under the passenger seat
 
* Modify the undertray to go back on
 
* Tape over the top radiator area
 
 
* Fix the radiator shroud to move under the brackets and be flush on the rad
 
* Fix the radiator shroud to move under the brackets and be flush on the rad
 
* Change rear diff bushings
 
* Change rear diff bushings
 
* Add bracket to hold lexan down
 
* Add bracket to hold lexan down
* Add 10mm front spacers and cut fenders appropriately
+
* Make intake setup
 +
* Kill clutch interlock
 +
* Fab/Install splitter
 +
* Fab/Install wing
 +
* Set up VSS in AEM
  
 
==Long Term Checklist==
 
==Long Term Checklist==

Latest revision as of 08:58, 19 April 2012

Destination SSM Wiki

This wiki exists to document our Miata build for the autocross SSM class and any related work therein including custom uprights.

Primary Areas

Short Term Checklist

  • Make thicker brackets for headlights
  • Fix the radiator shroud to move under the brackets and be flush on the rad
  • Change rear diff bushings
  • Add bracket to hold lexan down
  • Make intake setup
  • Kill clutch interlock
  • Fab/Install splitter
  • Fab/Install wing
  • Set up VSS in AEM

Long Term Checklist

  • Shorten/Simplify brake lines
  • Shorten the cable from the Wideband
  • Lighter front brakes